Custom sheet metal in Marina should be designed around the final roof assembly, including any new sheathing or equipment work. Flashing, curbs and edge pieces need accurate dimensions and clear connections to the materials that will actually remain after reroofing.
Measure after resolving the assembly assumptions
For a custom edge cap, an added roof layer or new deck can change the dimension the piece must cover. Marina’s guide distinguishes overlays and different tear-off conditions, so the metal drawing should identify which assembly it assumes. Hold final fabrication until those dimensions are established. A piece made from an old edge measurement may fit poorly or alter the intended visible profile.
Coordinate custom flashings around equipment
If solar or mechanical equipment must be removed, define who provides access and who restores the equipment after the roof connection is completed. The city guide flags that work as a possible additional permit matter. Identify compatible metals, roof products and attachment details, and show joint locations on the drawing. A metal fabrication invoice alone does not describe the waterproof connection to a retained membrane, wall or equipment curb.
Details for Your Marina Custom Sheet Metal Quote
- Record final deck and covering thickness before fabrication.
- Label custom pieces and their roof-equipment connections.
- Assign equipment access and adjacent restoration responsibilities.
Custom Sheet Metal Questions in Marina
Can Marina flashing be copied from the old piece without review?
Local Sources
Reference: Marina Re-Roofing Requirements. Confirm current requirements for the actual property and scope.
